IT Disaster Recovery Planning
Technical guide to developing and testing IT disaster recovery plans including RTO/RPO requirements and failover strategies.
IT Disaster Recovery Planning
Overview
IT Disaster Recovery (DR) planning ensures technology systems can be restored and resume critical functions following a disruption.
Key Concepts
Recovery Objectives
| Term | Definition | |------|------------| | RTO | Recovery Time Objective - maximum acceptable downtime | | RPO | Recovery Point Objective - maximum acceptable data loss | | MTD | Maximum Tolerable Downtime - business threshold |
Tiered Recovery
| Tier | RTO | RPO | Strategy | |------|-----|-----|----------| | 1 | <1 hour | Near zero | Active-active, sync replication | | 2 | 1-4 hours | <1 hour | Hot standby, async replication | | 3 | 4-24 hours | <4 hours | Warm standby | | 4 | 1-3 days | <24 hours | Cold standby |
DR Strategies
Data Backup
- Full, incremental, differential
- On-site, off-site, cloud
- Retention policies
- Encryption requirements
Replication
Synchronous:
- Zero data loss
- Performance impact
- Limited distance
Asynchronous:
- Near-zero data loss
- Less performance impact
- Greater distance flexibility
Site Strategies
Hot Site:
- Fully operational
- Real-time data sync
- Fastest recovery
- Highest cost
Warm Site:
- Partially operational
- Periodic data sync
- Moderate recovery time
- Moderate cost
Cold Site:
- Basic infrastructure
- Manual data restore
- Slowest recovery
- Lowest cost
Cloud-Based DR
- DRaaS (Disaster Recovery as a Service)
- Multi-region deployment
- Auto-scaling
- Pay-per-use
DR Plan Components
Documentation
- System inventory and dependencies
- Recovery procedures
- Contact information
- Vendor information
- Network diagrams
Procedures
- Activation criteria
- Notification process
- Failover steps
- Failback procedures
- Testing protocols
Roles and Responsibilities
- DR coordinator
- Technical teams
- Business liaisons
- Vendor contacts
Testing Program
Test Types
| Type | Frequency | Scope | |------|-----------|-------| | Tabletop | Quarterly | Walkthrough | | Component | Monthly | Individual systems | | Integrated | Semi-annual | Multiple systems | | Full | Annual | Complete failover |
Test Objectives
- Validate procedures
- Measure RTO/RPO
- Identify gaps
- Train personnel
Documentation
- Test plan and scope
- Results and metrics
- Issues identified
- Remediation actions
Cloud Considerations
- Multi-region architecture
- Availability zones
- Cloud provider SLAs
- Data residency
- Egress costs